Display packaging fails against calendars, not budgets. A retailer confirms an end cap, a distributor moves a reset forward, a show date lands earlier than planned, and suddenly the display that was a next-quarter project is a this-month project. Here is what is realistic at each distance from the date.
How much time you actually have
| Time until you need them | What is realistic |
|---|---|
| Eight weeks or more | Any structure, any finish, and the cost saver sea lane is on the table for volume |
| Four weeks | Custom structure on the standard air lane, with finishing, if artwork is ready |
| Two weeks | Rush lane, simple counter display, print-ready artwork, same-day proof approval |
| Under two weeks | Talk to us before you promise the date. Some structures can be met and some cannot |
The honest version is that the last row depends entirely on the specification. We would rather tell you a date is not achievable than take the order and miss it.
Simplify the structure, not the brand
A rush is won by removing production passes, not by removing design quality. In practice that means: a counter display rather than a floor unit, a shipper that doubles as the display rather than two separate builds, one bold printed graphic rather than foil plus emboss plus spot gloss, and a standard tray or step structure rather than a bespoke silhouette. None of those choices makes the display look cheaper on a shelf. All of them shorten production.
Counter versus floor under time pressure
A counter display is a small footprint with a low quantity of board, usually a tray with a printed header. It is the format that rushes best. A floor display carries load, needs structural checking and often ships knocked down for assembly in store, all of which take time. If the date is short and the format is not contractually fixed, moving from floor to counter buys you the most schedule for the least compromise. See counter display boxes and display boxes.
What we need from you on day one
- The date the displays have to be in the store or the booth, not the date you would like them.
- The product dimensions and how many facings each display holds.
- Print-ready vector artwork with fonts outlined and bleed past the cut line.
- One named person who can approve the digital proof the day it arrives.
Design support is included, so if a dieline does not exist yet we will build it, but every hour spent rebuilding supplied artwork comes out of the same schedule.
Price and what stays included
The minimum is 100 units per size and artwork. Bulk pricing starts from about $0.48 per unit before the lane premium, confirmed on your written quote. The cutting die, printing plates, design support, US shipping and the digital proof are included on a rush exactly as they are on a standard order. Manufacturing is at West Chicago in the US and Guangzhou in China, and the quote names the plant and the lane. Specialty imported constructions can run up to about 12 weeks and are not rush candidates.
Send your date and specification to the quote form and we will confirm what the schedule allows. For lane pricing across all products, see rush custom boxes, and for booth packaging see custom packaging for trade shows.